EV Infrastructure & Battery Calculator

Optimize grid connections and size industrial batteries for EV fleets.

1. Grid Connection

A

2. Charger Specifications

3. Smart Load Management

100%

4. Battery Sizing

Check how big a battery you need to reach a specific number of chargers.

Analysis Results

Grid Power Limit
- kW
From Utility
Charger Capacity
-
Chargers
running at target speed
Power per Charger
- kW
At calculated load

Scenario Breakdown

Scenario Max Chargers Power Each Notes
Static Limited by Fuse - - Dumb chargers. The total of all charger Max Ratings cannot exceed the fuse. Safe but inefficient.
Dynamic Smart Management - - Smart chargers. They talk to each other to share available power, aiming for your Target Speed (e.g. 10A).
Max Physical Limit - - The theoretical limit. Chargers throttled to the absolute minimum (6A). Charging will be very slow.