EV Infrastructure & Battery Calculator
Optimize grid connections and size industrial batteries for EV fleets.
1. Grid Connection
A
2. Charger Specifications
3. Smart Load Management
100%
4. Battery Sizing
Check how big a battery you need to reach a specific number of chargers.
REC. INVERTER
- kW
REC. CAPACITY
- kWh
Analysis Results
Grid Power Limit
- kW
From Utility
Charger Capacity
-
Chargers
running at target speed
Power per Charger
- kW
At calculated load
Scenario Breakdown
| Scenario | Max Chargers | Power Each | Notes |
|---|---|---|---|
| Static Limited by Fuse | - | - | Dumb chargers. The total of all charger Max Ratings cannot exceed the fuse. Safe but inefficient. |
| Dynamic Smart Management | - | - | Smart chargers. They talk to each other to share available power, aiming for your Target Speed (e.g. 10A). |
| Max Physical Limit | - | - | The theoretical limit. Chargers throttled to the absolute minimum (6A). Charging will be very slow. |